Maintenance Period For Suspended Platform/Suspended Scaffolds
Maintenance includes daily inspection, regular maintenance and periodic overhaul.
The specific contents are in below forms.
A. Daily Inspection
Before each operation, the operator should inspect the suspended scaffolds/suspended platform  according to 《Daily checklist》(attachment NO. 1 ) and timely resolve the problems found.

B. Regular Maintenance (second level maintenance)
In addition to daily inspection, the suspended scaffolds/suspended platform should be overhauled by 《regular maintenance form》(attachment NO. 2). AS for the problems found in inspection, we should set plan and contact professional personnel to do maintenance work.

C.Regular maintenance period
1. As for the suspended scaffolds /suspended platform which do continues operation, depending on the frequency of operation, a month or every two months should be done regular maintenance.
2. As for the suspended scaffolds/suspended platform which do intermittence operation, accumulated 300 hours, they should be done regular maintenance.
3. As for the suspended scaffolds/suspended platform which is used over one month, it should be done regular maintenance before using.
4. When we finish one project, after disassembling, it should be done regular maintenance.

D.Periodic Overhaul 
Besides Regular maintenance, the items in periodic overhaul in 《Overhaul Checklist》(attachment NO. 3). Periodic overhaul should be done by professional and experienced manufacturer
Overhaul Deadline
1. The suspended scaffolds/suspended platform which is used in one year.
2. The suspended scaffolds/suspended platform which works 300 classes accumulated.

Attachment 1: Daily checklist

Order Inspection part             Inspection item Result
1

 

SuspensionMechanism Localization is reliable and the location can not be moved.  
Counterweight is complete without damage and fixed correctly  
Pins and fasteners are complete and reliable  
 

2

 

 

Wire rope

Firmly contact the suspended parts and rope clamps are reliable  
No loose, burrs, broken wire, indentation, corrosion  
No attachment mortar, paint and other debris  
Hammer and limit stops are in good condition, no loose  
  3 SuspendedScaffolds Weld without cracking and pin and bolt are fastening and architecture piece is not deformed  
Floor, rails and baffle-plate are no damage  
4

 

Hoister Adequate oil, good Lubricating, no leakage  
Can be firmly connected suspended scaffolds/suspended platform  
Can be lifted manually  
  5 Safety lock Rope wear good performance in rope wear  
manually lock rope can be achieved  
6

 

ElectricalSystem Zero line is reliable and there is leakage protectionWorkers wear non-slip insulated shoes  
Normal communication  
Wire, cable is not damaged.There are effective protection measures  
7

 

Safety bandSafety rope

 

No wear, corrosion, broken  
Accessories are intact  
Link meets request  
 

8

 

 

Unloaded

running

test

 

Operation button is sensitive  
Limit switches are effective  
Hoister start and brake normally and it can smoothly operation  
You can manually lock safety lock  
No abnormal noise and other exceptions  
Date   Equipment No.  
    Inspector  
  Director  

Attachment 2: Periodic checklist suspended platform

ITEM Position Testing Item Testingsituation Processingmethod Repairresult
 

 

1

 

 

Electric control

System

 

 

No damage in cable      
The cable is fixed well      
All the electric parts have no damage and they work properly      
The contact points of relay and contactor are no ablation      
Limit devices are flexible and complete      
Control buttons are flexible and complete      
Insulation, grounding and zero resistance are meeting request.      
2 Suspended

Mechanism

No deformation and corrosion      
No cracking      
Pins and fasteners have no loose      
3 Wire rope No broken and wear      
The clamps have no loose      
4 Safety bandSafety rope Fixed end and contact point with corner have no wearing      
No broken and wear      
5 Safety lock Moving parts are oiled with right amount of grease      
Spring recover is normal      
Handle operation is flexible      
Wheel’s rotation is flexible with no wear.      
6  

Hoister

No oil leak      
Normal wear in inlet and outlet of rope      
No unusual noise      
Manually lift can be well done      
Brake Good and normal wear for wearing plate      
7 SuspendedPlatform No deformation and corrosion      
No cracking      
Pins and fasteners have no loose      
Date   Equipment NO. Inspection
    Maintenance personal  
Approval personal  

Attachment 3: Overhaul Checklist

ITEM Position Testing Item Testingsituation Processingmethod Repairresult
 

 

1

 

 

Electric control

System

 

 

Replace or repair the damage electric ones      
Test various insulation protection of cable and ensure no damage or ageing. Otherwise we replace them.      
Please to test various contactors and wiring. And if necessary, we rearrange and re-wire them.      
2 Suspended

Mechanism

To replace the ones that were worn or corroded over 10% of its original.      
Replace the ones that can be repaired      
Re-paint after testing      
3 Wire rope Piecewise check and replace the ones that are broken, seriously wearing, deformation and relaxation.      
To test the rope fixed end and as to the damage ones, we should re-fix or replace them.      
4 Safety lock Disintegration cleaning and replace the spare parts      
To detect the key shafts and holes and main parameters. To repair the parts that can be repaired and replace the ones that can not be repaired.      
Feeding the lubricant according to request      
After reassembling, please to do comprehensive testing and calibrate according to request before dispatching from the factory.      
5  

Hoister

Disintegration cleaning and replace the spare parts      
To detect the gear and turbine pay and the key shafts and holes and main parameters. To repair the parts that can be repaired and replace the ones that can not be repaired.      
Feeding the lubricant according to request      
     
After reassembling, please to do comprehensive testing and calibrate according to request before dispatching from the factory.      
6 SuspendedPlatform To replace the ones that were worn or corroded over 10% of its original.      
Replace the parts which can not be repaired      
Paint again after testing      
Date   Equipment NO. Inspection
 

Conclusion

  Maintenance personal  
Approval personal